{"id":4578,"date":"2023-01-13T10:53:14","date_gmt":"2023-01-13T02:53:14","guid":{"rendered":"https:\/\/en.kn-nanjing.com\/?p=4578"},"modified":"2023-01-13T10:53:16","modified_gmt":"2023-01-13T02:53:16","slug":"nanjing-metro-line-1-north-extension-applied-with-kangni-platform-screen-door-system-enters-official-operation","status":"publish","type":"post","link":"https:\/\/en.kn-nanjing.com\/de\/nanjing-metro-line-1-north-extension-applied-with-kangni-platform-screen-door-system-enters-official-operation\/","title":{"rendered":"Nanjing Metro Linie 1 Nord Erweiterung mit Kangni Platform Screen Door System nimmt offiziellen Betrieb auf"},"content":{"rendered":"

28. Dezember 2022<\/p>\n\n\n\n

\"202212news\"<\/figure>\n\n\n\n

Die gesamte L\u00e4nge der Nordverl\u00e4ngerung der Nanjing-Linie 1 betr\u00e4gt 6,54 km und umfasst 5 U-Bahn-Stationen. Der U-Bahn-Zug ist vom Typ A mit 6 Waggons ausgestattet. F\u00fcr dieses Projekt wurde in der U-Bahn-Station ein Bahnsteigt\u00fcrsystem in voller H\u00f6he installiert. <\/p>\n\n\n\n

Der Bau des Bahnsteigt\u00fcrsystems begann am 1. November 2021 und wurde am 19. Dezember 2022 erfolgreich abgenommen; die Pr\u00fcfung der Inbetriebnahmebedingungen wurde am 24. Dezember 2022 abgeschlossen. Bei hohem Fahrgastaufkommen gingen alle 53 Z\u00fcge der Nordverl\u00e4ngerung der Nanjing Metro Linie 1 w\u00e4hrend des Testbetriebs in Betrieb. Der Testbetrieb begann um 5:42 Uhr und endete um 0:44 Uhr am n\u00e4chsten Tag. Der PSD-Betrieb dauerte fast 19 Stunden und brachte gro\u00dfen Druck mit sich. <\/p>\n\n\n\n

W\u00e4hrend des Abnahmezeitraums konsultierte die Sachverst\u00e4ndigengruppe technische Unterlagen, z. B. Pr\u00fcfberichte \u00fcber die PSD-Notstromversorgung, die Isolierung des T\u00fcrk\u00f6rpers und der Erdung, die Leistung des Sicherheitsglases, den PSD-Pr\u00fcfbericht \u00fcber den Insassenschutz, den Bericht \u00fcber den 144-Stunden-Dauerbetrieb (10.000-maliger Einlauftest) und andere Daten. Au\u00dferdem werden die PSD-Betriebsdaten, die Funktion der Fehlerdatenanzeige und die Alarmfunktion vor Ort \u00fcberpr\u00fcft, und die Inspektion und der Test der technischen Einheit wurden ebenfalls durchgef\u00fchrt, um die Konstruktionsanforderungen zu erf\u00fcllen. <\/p>\n\n\n\n

Reiten Sie die Wellen, nutzen Sie den Tag. Kangni wird sein Bestes tun, um den Betrieb der neuen U-Bahn-Linie zu gew\u00e4hrleisten, und mit Nanjing Metro zusammenarbeiten, um zum Bau der neuen Linie beizutragen. <\/p>","protected":false},"excerpt":{"rendered":"

Dec. 28th, 2022 The full length of Nanjing Line 1 North Extension is 6.54km, with 5 underground stations. The metro train applies type A 6-car configuration. Full height platform screen door system is installed on the underground station for this project. The platform door system started on-site construction on November 1, 2021, and successfully passed …<\/p>\n

Nanjing Metro Linie 1 Nord Erweiterung mit Kangni Platform Screen Door System nimmt offiziellen Betrieb auf<\/span> Mehr lesen \"<\/a><\/p>","protected":false},"author":2,"featured_media":4579,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"yst_prominent_words":[1281,1279,1247,1172,64,131,256,413,1280,1278,1277,246,869,197,1274,1282,247,852,410,1283],"class_list":["post-4578","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-company-news"],"_links":{"self":[{"href":"https:\/\/en.kn-nanjing.com\/de\/wp-json\/wp\/v2\/posts\/4578","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/en.kn-nanjing.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/en.kn-nanjing.com\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/en.kn-nanjing.com\/de\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/en.kn-nanjing.com\/de\/wp-json\/wp\/v2\/comments?post=4578"}],"version-history":[{"count":1,"href":"https:\/\/en.kn-nanjing.com\/de\/wp-json\/wp\/v2\/posts\/4578\/revisions"}],"predecessor-version":[{"id":4583,"href":"https:\/\/en.kn-nanjing.com\/de\/wp-json\/wp\/v2\/posts\/4578\/revisions\/4583"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/en.kn-nanjing.com\/de\/wp-json\/wp\/v2\/media\/4579"}],"wp:attachment":[{"href":"https:\/\/en.kn-nanjing.com\/de\/wp-json\/wp\/v2\/media?parent=4578"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/en.kn-nanjing.com\/de\/wp-json\/wp\/v2\/categories?post=4578"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/en.kn-nanjing.com\/de\/wp-json\/wp\/v2\/tags?post=4578"},{"taxonomy":"yst_prominent_words","embeddable":true,"href":"https:\/\/en.kn-nanjing.com\/de\/wp-json\/wp\/v2\/yst_prominent_words?post=4578"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}