{"id":4831,"date":"2024-03-29T15:58:16","date_gmt":"2024-03-29T07:58:16","guid":{"rendered":"https:\/\/en.kn-nanjing.com\/?p=4831"},"modified":"2024-04-23T11:30:26","modified_gmt":"2024-04-23T03:30:26","slug":"kangni-platform-screen-door-contributes-to-the-initial-operation-of-nanjing-metro-line-5-southern-section","status":"publish","type":"post","link":"https:\/\/en.kn-nanjing.com\/es\/kangni-platform-screen-door-contributes-to-the-initial-operation-of-nanjing-metro-line-5-southern-section\/","title":{"rendered":"La puerta mosquitera del and\u00e9n de Kangni contribuye al funcionamiento inicial del tramo sur de la l\u00ednea 5 del metro de Nanjing"},"content":{"rendered":"

29 de marzo de 2024<\/p>\n\n\n\n

\"march<\/figure><\/div>\n\n\n\n

La puesta en marcha del tramo sur del proyecto de la l\u00ednea 5 del metro de Nanjing comienza en la estaci\u00f3n de la avenida Jiyin y termina en la estaci\u00f3n de Wenjing Road, con una longitud total de 12,9 km, todos ellos subterr\u00e1neos, y 9 estaciones, incluidas 3 de intercambio. Esta l\u00ednea se extiende a lo largo de la principal zona urbana de Jiangning Dongshan de norte a sur, enlaza con la l\u00ednea S1 del aeropuerto en la estaci\u00f3n de la avenida Jiyin, enlaza con la l\u00ednea 3 en la estaci\u00f3n de la avenida Chengxin y tambi\u00e9n puede realizar la transferencia en la estaci\u00f3n de Zhushan Road con la l\u00ednea 1 existente, lo que enlaza eficazmente la red de tr\u00e1fico tridimensional del distrito de Jiangning, aportando una gran importancia para la promoci\u00f3n del desarrollo regional.<\/p>\n\n\n\n

El vag\u00f3n de ingenier\u00eda de la l\u00ednea 5 de Nanjing es del tipo A, con una configuraci\u00f3n de 6 vagones, y la velocidad m\u00e1xima de funcionamiento dise\u00f1ada es de 80 km\/h. Se ha puesto en funcionamiento el sistema de puerta de and\u00e9n con mampara fabricado por Nanjing Kangni.<\/p>\n\n\n\n

La l\u00ednea 5 del metro de Nanjing adopta un sistema de puertas de and\u00e9n no cerradas (PSD) de altura completa para toda la l\u00ednea, con 30 puertas correderas y 6 puertas de emergencia a cada lado del and\u00e9n. El PSD adopta un dispositivo de transmisi\u00f3n de par de tuercas de tornillo de conducci\u00f3n de desarrollo propio, que se caracteriza por su f\u00e1cil sustituci\u00f3n, bajo nivel de ruido y ausencia de contaminaci\u00f3n. El PSD adopta un plan de dise\u00f1o de aislamiento segmentado, equipado con tira de luz de observaci\u00f3n auxiliar LED, goma y tira de luz antipatinaje, detector de huecos y otros dispositivos de protecci\u00f3n de pasajeros, cada lado del and\u00e9n est\u00e1 equipado con 6 juegos de pantalla de barras PIS de 86 pulgadas y la correspondiente capa aislante de la estaci\u00f3n.<\/p>","protected":false},"excerpt":{"rendered":"

March 29th, 2024 The initial operation of the southern section of Nanjing Metro Line 5 project starts from Jiyin Avenue Station and ends at Wenjing Road Station, with a total line length of 12.9km, all of which are laid underground, with 9 stations, including 3 interchange stations. This line is laid along the main urban area of Jiangning Dongshan …<\/p>\n

La puerta mosquitera del and\u00e9n de Kangni contribuye al funcionamiento inicial del tramo sur de la l\u00ednea 5 del metro de Nanjing<\/span> Leer M\u00e1s \"<\/a><\/p>","protected":false},"author":2,"featured_media":4832,"comment_status":"closed","ping_status":"closed","sticky":true,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"yst_prominent_words":[1456,1453,1454,1452,1464,155,869,1129,197,1274,1271,1461,134,127,126,1463,1455,128,1462,851],"class_list":["post-4831","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-company-news"],"_links":{"self":[{"href":"https:\/\/en.kn-nanjing.com\/es\/wp-json\/wp\/v2\/posts\/4831","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/en.kn-nanjing.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/en.kn-nanjing.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/en.kn-nanjing.com\/es\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/en.kn-nanjing.com\/es\/wp-json\/wp\/v2\/comments?post=4831"}],"version-history":[{"count":1,"href":"https:\/\/en.kn-nanjing.com\/es\/wp-json\/wp\/v2\/posts\/4831\/revisions"}],"predecessor-version":[{"id":4836,"href":"https:\/\/en.kn-nanjing.com\/es\/wp-json\/wp\/v2\/posts\/4831\/revisions\/4836"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/en.kn-nanjing.com\/es\/wp-json\/wp\/v2\/media\/4832"}],"wp:attachment":[{"href":"https:\/\/en.kn-nanjing.com\/es\/wp-json\/wp\/v2\/media?parent=4831"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/en.kn-nanjing.com\/es\/wp-json\/wp\/v2\/categories?post=4831"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/en.kn-nanjing.com\/es\/wp-json\/wp\/v2\/tags?post=4831"},{"taxonomy":"yst_prominent_words","embeddable":true,"href":"https:\/\/en.kn-nanjing.com\/es\/wp-json\/wp\/v2\/yst_prominent_words?post=4831"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}