{"id":4975,"date":"2025-02-23T15:48:37","date_gmt":"2025-02-23T07:48:37","guid":{"rendered":"https:\/\/en.kn-nanjing.com\/?p=4975"},"modified":"2025-04-01T16:06:43","modified_gmt":"2025-04-01T08:06:43","slug":"kangni-platform-screen-doors-facilitate-smooth-launch-of-taiyuan-metro-line-1","status":"publish","type":"post","link":"https:\/\/en.kn-nanjing.com\/es\/kangni-platform-screen-doors-facilitate-smooth-launch-of-taiyuan-metro-line-1\/","title":{"rendered":"Las puertas de and\u00e9n Kangni facilitan la puesta en marcha de la l\u00ednea 1 del metro de Taiyuan"},"content":{"rendered":"
\n\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t
\n

22 febrerond<\/sup>, 2025<\/p>\n\n\n\n

\"feb.<\/figure>\n\n\n\n

A las 10:30 de la ma\u00f1ana del 22 de febrero de 2025, se alcanz\u00f3 un hito hist\u00f3rico en el desarrollo del transporte ferroviario de Shanxi con la salida del primer tren de la estaci\u00f3n de Helongwan, lo que supuso el inicio oficial de la Fase I de la L\u00ednea 1 del Metro de Taiyuan. Cabe destacar que las puertas de los veh\u00edculos ferroviarios y el sistema de puertas de and\u00e9n (PSD) de la L\u00ednea 1 fueron suministrados por Kangni, proveedor mundial de soluciones de puertas para veh\u00edculos ferroviarios. Esta nueva arteria, que atraviesa la ciudad de este a oeste, no s\u00f3lo reconfigura la red ferroviaria urbana de Taiyuan, sino que eleva a la \"Ciudad del Drag\u00f3n\" a una nueva fase de transporte tridimensional integrado.<\/p>\n\n\n\n

A lo largo de la fase de construcci\u00f3n, Kangni no s\u00f3lo suministr\u00f3 equipos de alta calidad, sino que tambi\u00e9n despleg\u00f3 un experimentado equipo de proyecto para adaptar los planes de construcci\u00f3n, optimizar los procesos de puesta en servicio y garantizar una ejecuci\u00f3n impecable. Ante los complejos retos de ingenier\u00eda y los ajustados plazos, el equipo demostr\u00f3 una colaboraci\u00f3n y eficiencia excepcionales, superando los obst\u00e1culos para garantizar la entrega puntual del proyecto.<\/p>\n\n\n\n

Entre todos los proyectos de la L\u00ednea 1, el sistema de puerta de and\u00e9n de Kangni fue el primero en superar la aceptaci\u00f3n de ingenier\u00eda unitaria, lo que le vali\u00f3 grandes elogios por parte de Taiyuan Metro Construction Co. En 2024, Kangni recibi\u00f3 una carta de recomendaci\u00f3n del cliente y el certificado de \"proveedor destacado\" del contratista general, China Railway Construction Electrification Bureau Group Co., Ltd. Las rigurosas evaluaciones de seguridad confirmaron la fiabilidad del sistema y los expertos elogiaron un\u00e1nimemente su estabilidad y avanzado dise\u00f1o.<\/p>\n<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t<\/div>","protected":false},"excerpt":{"rendered":"

Feb 22nd, 2025 At 10:30 AM on February 22, 2025, a historic milestone was achieved in Shanxi’s Rail Transit development as the first train departed from Helongwan Station, signaling the official commencement of Taiyuan Metro Line 1 Phase I. Notably, the railway vehicle doors and platform screen doors (PSD) system for Line 1 were supplied by Kangni, …<\/p>\n

Las puertas de and\u00e9n Kangni facilitan la puesta en marcha de la l\u00ednea 1 del metro de Taiyuan<\/span> Leer M\u00e1s \"<\/a><\/p>","protected":false},"author":2,"featured_media":4976,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"yst_prominent_words":[1597,1596,243,79,900,130,413,1280,246,882,134,127,263,264,1595,138,252,1599,1598,133],"class_list":["post-4975","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-company-news"],"_links":{"self":[{"href":"https:\/\/en.kn-nanjing.com\/es\/wp-json\/wp\/v2\/posts\/4975","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/en.kn-nanjing.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/en.kn-nanjing.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/en.kn-nanjing.com\/es\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/en.kn-nanjing.com\/es\/wp-json\/wp\/v2\/comments?post=4975"}],"version-history":[{"count":2,"href":"https:\/\/en.kn-nanjing.com\/es\/wp-json\/wp\/v2\/posts\/4975\/revisions"}],"predecessor-version":[{"id":4986,"href":"https:\/\/en.kn-nanjing.com\/es\/wp-json\/wp\/v2\/posts\/4975\/revisions\/4986"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/en.kn-nanjing.com\/es\/wp-json\/wp\/v2\/media\/4976"}],"wp:attachment":[{"href":"https:\/\/en.kn-nanjing.com\/es\/wp-json\/wp\/v2\/media?parent=4975"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/en.kn-nanjing.com\/es\/wp-json\/wp\/v2\/categories?post=4975"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/en.kn-nanjing.com\/es\/wp-json\/wp\/v2\/tags?post=4975"},{"taxonomy":"yst_prominent_words","embeddable":true,"href":"https:\/\/en.kn-nanjing.com\/es\/wp-json\/wp\/v2\/yst_prominent_words?post=4975"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}