{"id":4765,"date":"2023-11-30T10:27:11","date_gmt":"2023-11-30T02:27:11","guid":{"rendered":"https:\/\/en.kn-nanjing.com\/?p=4765"},"modified":"2023-12-14T11:00:24","modified_gmt":"2023-12-14T03:00:24","slug":"kangni-platform-screen-door-assisted-in-the-opening-and-initial-operation-for-chongqing-rail-transit-line-5-dashiba-station-to-shiqiaopu-station","status":"publish","type":"post","link":"https:\/\/en.kn-nanjing.com\/fr\/kangni-platform-screen-door-assisted-in-the-opening-and-initial-operation-for-chongqing-rail-transit-line-5-dashiba-station-to-shiqiaopu-station\/","title":{"rendered":"La porte blind\u00e9e de quai de Kangni a contribu\u00e9 \u00e0 l'ouverture et \u00e0 l'exploitation initiale de la ligne 5 du r\u00e9seau de transport ferroviaire de Chongqing (de la gare de Dashiba \u00e0 la gare de Shiqiaopu)."},"content":{"rendered":"

30 novembre<\/p>\n\n\n\n

\"november\"<\/figure>\n\n\n\n

La ligne 5 du r\u00e9seau de transport ferroviaire de Chongqing (de la gare de Dashiba \u00e0 la gare de Shiqiaopu), \u00e9quip\u00e9e du syst\u00e8me de porte de quai de Kangni, entre en service. <\/p>\n\n\n\n

Depuis lors, la ligne 5 du r\u00e9seau de transport ferroviaire de Chongqing est ouverte \u00e0 tous. <\/p>\n\n\n\n

La phase I du projet de la ligne 5 de transport ferroviaire de Chongqing commence \u00e0 la station Garden Expo Center et se termine \u00e0 la station Tiaodeng. En raison de la complexit\u00e9 de la conception et des difficult\u00e9s de construction du pont du village de Hongyan, la ligne 5 de Chongqing a \u00e9t\u00e9 mise en service par segments afin d'am\u00e9liorer l'efficacit\u00e9 des d\u00e9placements des habitants de Chongqing. La station Garden Expo Center vers la station Dashiba a \u00e9t\u00e9 mise en service le 28 d\u00e9cembre 2017, et la station Shijiaopu vers la station Tiaodeng a \u00e9t\u00e9 mise en service le 20 janvier 2021. <\/p>\n\n\n\n

Depuis que le projet a \u00e9t\u00e9 attribu\u00e9, les dirigeants de la division des portes grillag\u00e9es de la plate-forme Kangni ont soigneusement organis\u00e9, g\u00e9r\u00e9 scientifiquement et d\u00e9velopp\u00e9 des mesures strictes de gestion de projet en combinaison avec les caract\u00e9ristiques de la phase I du projet de la ligne 5 de Chongqing. Au cours du processus de construction du projet, Kangni a constamment surmont\u00e9 les difficult\u00e9s et a finalement achev\u00e9 la t\u00e2che avec succ\u00e8s. <\/p>\n\n\n\n

Apr\u00e8s avoir pass\u00e9 toutes sortes d'acceptations, le taux d'essai de la porte moustiquaire \u00e0 plate-forme Kangni est bien inf\u00e9rieur aux indicateurs de service de la sp\u00e9cification, ce qui a remport\u00e9 les \u00e9loges unanimes des experts. <\/p>","protected":false},"excerpt":{"rendered":"

Nov. 30th Chongqing Rail Transit Line 5 (Dashiba Station to Shiqiaopu Station) equipped with Kangni’s Platform Door System enters initial operation. Since then, Chongqing Rail Transit Line 5 welcomes fully opening! Chongqing Rail Transit Line 5 Phase I project starts from Garden Expo Center Station and ends at Tiaodeng Station. Due to complicated design as …<\/p>\n

La porte blind\u00e9e de quai de Kangni a contribu\u00e9 \u00e0 l'ouverture et \u00e0 l'exploitation initiale de la ligne 5 du r\u00e9seau de transport ferroviaire de Chongqing (de la gare de Dashiba \u00e0 la gare de Shiqiaopu).<\/span> Lire plus \"<\/a><\/p>","protected":false},"author":2,"featured_media":4766,"comment_status":"closed","ping_status":"closed","sticky":true,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"yst_prominent_words":[1420,1406,1427,1425,1424,1413,1411,1410,1409,1421,1418,155,1419,1412,126,505,1428,1426,1407,1405],"class_list":["post-4765","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-company-news"],"_links":{"self":[{"href":"https:\/\/en.kn-nanjing.com\/fr\/wp-json\/wp\/v2\/posts\/4765","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/en.kn-nanjing.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/en.kn-nanjing.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/en.kn-nanjing.com\/fr\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/en.kn-nanjing.com\/fr\/wp-json\/wp\/v2\/comments?post=4765"}],"version-history":[{"count":3,"href":"https:\/\/en.kn-nanjing.com\/fr\/wp-json\/wp\/v2\/posts\/4765\/revisions"}],"predecessor-version":[{"id":4780,"href":"https:\/\/en.kn-nanjing.com\/fr\/wp-json\/wp\/v2\/posts\/4765\/revisions\/4780"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/en.kn-nanjing.com\/fr\/wp-json\/wp\/v2\/media\/4766"}],"wp:attachment":[{"href":"https:\/\/en.kn-nanjing.com\/fr\/wp-json\/wp\/v2\/media?parent=4765"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/en.kn-nanjing.com\/fr\/wp-json\/wp\/v2\/categories?post=4765"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/en.kn-nanjing.com\/fr\/wp-json\/wp\/v2\/tags?post=4765"},{"taxonomy":"yst_prominent_words","embeddable":true,"href":"https:\/\/en.kn-nanjing.com\/fr\/wp-json\/wp\/v2\/yst_prominent_words?post=4765"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}