{"id":4975,"date":"2025-02-23T15:48:37","date_gmt":"2025-02-23T07:48:37","guid":{"rendered":"https:\/\/en.kn-nanjing.com\/?p=4975"},"modified":"2025-04-01T16:06:43","modified_gmt":"2025-04-01T08:06:43","slug":"kangni-platform-screen-doors-facilitate-smooth-launch-of-taiyuan-metro-line-1","status":"publish","type":"post","link":"https:\/\/en.kn-nanjing.com\/fr\/kangni-platform-screen-doors-facilitate-smooth-launch-of-taiyuan-metro-line-1\/","title":{"rendered":"Les portes de quai Kangni facilitent le lancement de la ligne 1 du m\u00e9tro de Taiyuan"},"content":{"rendered":"
\n\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t
\n

22 f\u00e9vriernd<\/sup>, 2025<\/p>\n\n\n\n

\"feb.<\/figure>\n\n\n\n

Le 22 f\u00e9vrier 2025 \u00e0 10h30, une \u00e9tape historique a \u00e9t\u00e9 franchie dans le d\u00e9veloppement du transport ferroviaire de Shanxi avec le d\u00e9part du premier train de la station Helongwan, marquant le d\u00e9but officiel de la phase I de la ligne 1 du m\u00e9tro de Taiyuan. Les portes des v\u00e9hicules ferroviaires et les portes pali\u00e8res de la ligne 1 ont notamment \u00e9t\u00e9 fournies par Kangni, un fournisseur mondial de solutions de portes pour v\u00e9hicules ferroviaires. Traversant la ville d'est en ouest, cette nouvelle art\u00e8re ne remod\u00e8le pas seulement le r\u00e9seau ferroviaire urbain de Taiyuan, mais fait \u00e9galement entrer la \"cit\u00e9 du dragon\" dans une nouvelle phase de transport tridimensionnel int\u00e9gr\u00e9.<\/p>\n\n\n\n

Tout au long de la phase de construction, Kangni a non seulement fourni des \u00e9quipements de haute qualit\u00e9, mais a \u00e9galement d\u00e9ploy\u00e9 une \u00e9quipe de projet exp\u00e9riment\u00e9e pour adapter les plans de construction, optimiser les processus de mise en service et assurer une ex\u00e9cution sans faille. Confront\u00e9e \u00e0 des d\u00e9fis techniques complexes et \u00e0 des calendriers serr\u00e9s, l'\u00e9quipe a fait preuve d'une collaboration et d'une efficacit\u00e9 exceptionnelles, surmontant les obstacles pour garantir la livraison du projet dans les d\u00e9lais impartis.<\/p>\n\n\n\n

Parmi tous les projets de la ligne 1, le syst\u00e8me de portes grillag\u00e9es de Kangni a \u00e9t\u00e9 le premier \u00e0 \u00eatre accept\u00e9 par l'ing\u00e9nierie unitaire, ce qui lui a valu les \u00e9loges de Taiyuan Metro Construction Co. En 2024, Kangni a re\u00e7u une lettre de f\u00e9licitations de la part du client et s'est vu d\u00e9cerner le certificat de \"fournisseur exceptionnel\" par l'entrepreneur g\u00e9n\u00e9ral, China Railway Construction Electrification Bureau Group Co, Ltd. Des \u00e9valuations rigoureuses des performances en mati\u00e8re de s\u00e9curit\u00e9 ont confirm\u00e9 la fiabilit\u00e9 du syst\u00e8me, les experts ayant unanimement salu\u00e9 sa stabilit\u00e9 et sa conception avanc\u00e9e.<\/p>\n<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t<\/div>","protected":false},"excerpt":{"rendered":"

Feb 22nd, 2025 At 10:30 AM on February 22, 2025, a historic milestone was achieved in Shanxi’s Rail Transit development as the first train departed from Helongwan Station, signaling the official commencement of Taiyuan Metro Line 1 Phase I. Notably, the railway vehicle doors and platform screen doors (PSD) system for Line 1 were supplied by Kangni, …<\/p>\n

Les portes de quai Kangni facilitent le lancement de la ligne 1 du m\u00e9tro de Taiyuan<\/span> Lire plus \"<\/a><\/p>","protected":false},"author":2,"featured_media":4976,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"yst_prominent_words":[1597,1596,243,79,900,130,413,1280,246,882,134,127,263,264,1595,138,252,1599,1598,133],"class_list":["post-4975","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-company-news"],"_links":{"self":[{"href":"https:\/\/en.kn-nanjing.com\/fr\/wp-json\/wp\/v2\/posts\/4975","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/en.kn-nanjing.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/en.kn-nanjing.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/en.kn-nanjing.com\/fr\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/en.kn-nanjing.com\/fr\/wp-json\/wp\/v2\/comments?post=4975"}],"version-history":[{"count":2,"href":"https:\/\/en.kn-nanjing.com\/fr\/wp-json\/wp\/v2\/posts\/4975\/revisions"}],"predecessor-version":[{"id":4986,"href":"https:\/\/en.kn-nanjing.com\/fr\/wp-json\/wp\/v2\/posts\/4975\/revisions\/4986"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/en.kn-nanjing.com\/fr\/wp-json\/wp\/v2\/media\/4976"}],"wp:attachment":[{"href":"https:\/\/en.kn-nanjing.com\/fr\/wp-json\/wp\/v2\/media?parent=4975"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/en.kn-nanjing.com\/fr\/wp-json\/wp\/v2\/categories?post=4975"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/en.kn-nanjing.com\/fr\/wp-json\/wp\/v2\/tags?post=4975"},{"taxonomy":"yst_prominent_words","embeddable":true,"href":"https:\/\/en.kn-nanjing.com\/fr\/wp-json\/wp\/v2\/yst_prominent_words?post=4975"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}